Pool Progress

A lot of progress was made last week with ground breaking Monday, April 4th and pool delivery, Thursday, April 11th.  Now each day they add sand around the perimeter and water it down (of course the rain is doing that for us this week!) and add water inside the pool to the same level to keep it from bowing out.

The pool arrives!

Pool is attached to the crane.

Crane lifts pool and  positions in hole.

Several days later with several layers of sand around perimeter and water being added.  

Pool Arrival Today!!

Before
We are making progress on getting ready for the summer swim lessons 2016 and opening our doors in Lehi Utah.   It has been a busy week with the dig beginning Monday (April 4th)!   Still planning to be ready for our first session in June, 2016!



Day 1

Day 3 Shallow End

Day 3 Deep End

Our mess of a backyard!